| Cliftonville, Nr Margate, Kent The M24 was chosen for this job because of its narrow front support of just 5.5m this allowed the pump to be set up on the side of the road and still allow for traffic to pass by. The boom was then placed over the wall and concrete was successfully placed for footings.
|
|