Past
Projects

Sittingbourne, Kent

The M24 was chosen to pump concrete for the floor in this storage barn because of its low unfolding height of just 5 metres this meant the pour could be carried out off the boom rather than using ground line making the job quicker, easier and safer.

SNC10063 SNC10065 SNC10068
SNC10069 SNC10077 SNC10078
SNC10079 SNC10081 SNC10084